Water Managament

Green Solutions | Water Treatment System at Schlumberger in Duri Base – Riau

Green Solutions | Water Treatment System at Schlumberger Duri Base - Riau

Green Solutions | Water Treatment System at Schlumberger in Duri Base – Riau

Petrolog provided Water Treatment System for clean water needs at Schlumberger in Duri – Riau with a processing capacity of 330 m3/day. The scope of work included design, engineering, and construction of the Water Treatment Plant and installation of clean water distribution.